An analytical review for foreign equipment manufacturers, suppliers, engineering firms and investors who work with Türkiye’s oil and gas sector or plan to enter it. Data as of 11 November 2026.
In 2026 Türkiye remains one of the most active buyers of industrial equipment for oil and gas in its region. The main driver is Phase 3 of the Sakarya gas field in the Black Sea: line pipe, flexible pipe, umbilicals, risers, subsea equipment and a floating production unit have already been contracted for it. At the same time, state-owned TPAO and BOTAŞ keep tendering for pumps, pipe, LNG carriers and compressor station upgrades, while the private refiners STAR (SOCAR Türkiye) and Tüpraş are adding new units.
The real picture is more nuanced than the headlines. Many values are disclosed only as ranges, several large contracts were signed in 2024–2025, and a tender notice is not a signed contract. Below we separate confirmed 2026 contracts, open and closed tenders, legacy projects, import statistics and local content (Turkish: yerlilik) requirements, so that a foreign supplier can see where demand actually is and how to reach it.
The review is based on public sources: company press releases, notices in the Official Gazette (Resmî Gazete) and on the BOTAŞ website, Tüpraş reporting, TÜİK trade data and statements by Türkiye’s Ministry of Energy. Where a value or supplier is not disclosed, we say so.
Key takeaways
- The biggest buyer in 2026 is Sakarya Phase 3. Tenaris is supplying about 128,000 tonnes of pipe; Subsea7 won two variation orders worth USD 300–500 million and USD 50–150 million.
- Refining is buying too. STAR (SOCAR Türkiye) signed an EPC contract for a new jet fuel unit with an investment budget of about TRY 6 billion; Petkim awarded FEED work for new plants with a USD 70 million budget.
- TPAO and BOTAŞ tenders covered centrifugal pumps, steel pipe for gas lines, LNG carriers and compressor station modifications.
- Imports of pumps, compressors, valves, seamless pipe and drilling machinery reached USD 5.37 billion in January–September 2026 (all industries, not oil and gas only).
- Local content is tightening: since 1 January 2026 new domestic goods certificate rules apply (at least 51% local contribution), and some tenders are closed to foreign bidders.
Who buys oil and gas equipment in Türkiye in 2026?
Short answer: the main buyers are the state oil and gas company TPAO (Türkiye Petrolleri Anonim Ortaklığı) and its offshore arm TP-OTC, the state gas operator BOTAŞ, and the private refiners STAR (SOCAR Türkiye) and Tüpraş.
Each has its own procurement profile. TPAO buys everything linked to production: line pipe and casing, drilling services, pumps, subsea equipment. TP-OTC (Turkish Petroleum Offshore Technology Center) manages the offshore contracts at Sakarya. BOTAŞ is responsible for trunk pipelines, compressor stations, storage and LNG infrastructure, including floating storage and regasification units (FSRU). STAR and Tüpraş buy process units, licences and EPC packages for refining.
| Buyer | What it buys in 2026 | Where to find opportunities |
|---|---|---|
| TPAO / TP-OTC | Pipe, casing, subsea equipment, pumps, drilling services, logistics at the Gabar fields | Official Gazette notices, EKAP, direct contracts with major contractors |
| BOTAŞ | Steel pipe for gas lines, LNG carriers and charters, compressor station modifications, LNG terminal repairs | botas.gov.tr, EKAP |
| STAR Refinery / SOCAR Türkiye | EPC for a new jet fuel unit; licences and FEED for Petkim | Company press releases, direct negotiations |
| Tüpraş | Refinery energy infrastructure (12.6 MW wind farm), propylene project | Quarterly reports, KAP |
Which equipment contracts were signed in 2026?
Short answer: five major 2026 deals are publicly confirmed: Tenaris and two Subsea7 orders at Sakarya, the STAR EPC contract and the Petkim FEED contracts, plus Tüpraş energy infrastructure agreements.
| Date | Buyer and project | Supplier | Equipment and scope | Value |
|---|---|---|---|---|
| 28 Jan 2026 | TPAO, Sakarya Phase 3 | Tenaris (headquartered in Luxembourg; mills in Italy and Brazil) | 22,700 t seamless pipe, 87,800 t welded pipe, 7,700 t riser pipe, 10,000 t casing | Not disclosed |
| 4 Mar 2026 | TP-OTC, Sakarya Phase 3 / Göktepe | Subsea7 (Luxembourg; project office in Istanbul) | EPCI: about 20 km flexible pipe, about 120 km umbilicals, rigid production riser, subsea equipment | USD 300–500m (company range) |
| 23 Sep 2026 | TP-OTC, Sakarya Phase 3 | Subsea7 | FPU tow-out, mooring line installation and hook-up | USD 50–150m (company range) |
| 28 Sep 2026 | SOCAR Türkiye / Petkim | Technip Energies, Univation Technologies, Lummus Novolen Technology | Licensing, FEED and engineering for new ethylene, polyethylene and polypropylene plants | FEED budget USD 70m |
| Late Oct – early Nov 2026 | STAR Refinery (SOCAR Türkiye) | Consortium of international companies | EPC for a new jet fuel (Kero-Merox) unit | About TRY 6bn (investment budget) |
Tenaris: pipe for Sakarya
In late January 2026 Tenaris announced two contracts with TPAO for Sakarya Phase 3. Seamless pipe (22,700 tonnes) comes from the Dalmine mill in Italy and will be used for flowlines and a 62 km monoethylene glycol (MEG) line. Welded pipe (87,800 tonnes) is made at the Confab mill in Brazil for a 180 km gas export pipeline. A further 7,700 tonnes of line pipe with 3LPP anti-corrosion coating will go to production risers, MEG risers and the export line, and a 1.2 km section of the export line receives concrete weight coating. Separately, Tenaris supplies 10,000 tonnes of casing for offshore drilling. Neither the value nor the exact signing date has been disclosed: 28 January is the announcement date.
Subsea7: tying in Göktepe and installing the FPU
Subsea7 has worked at Sakarya since Phase 1. Its main Phase 3 contract for subsea umbilicals, risers and flowlines (SURF) was announced on 27 August 2025 in the USD 750 million to 1.25 billion range. In 2026 two orders were added. The March award (a “large” contract in Subsea7’s terms, USD 300–500 million) connects the newly discovered Göktepe field to the Phase 3 floating production unit, with offshore work planned for 2027–2028. The September award (“sizeable”, USD 50–150 million) covers towing the FPU, installing mooring lines and hook-up. Project management and engineering are run from Subsea7’s Istanbul office.
Keep in mind that these are ranges disclosed to stock market investors, not exact values, and that they combine equipment and services rather than pure hardware purchases.
STAR Refinery: a new jet fuel unit
STAR Refinery in Aliağa (İzmir), owned by SOCAR Türkiye, signed an EPC (engineering, procurement and construction) contract with a consortium of international companies for a new jet fuel unit based on Kero-Merox technology. The investment budget is about TRY 6 billion; the EPC contract value itself was not disclosed. Once jet fuel production moves to the new unit, the existing kerosene hydrotreater (KHT) will switch to diesel, raising diesel output by about 600,000 tonnes a year. The refinery currently processes 13 million tonnes a year, and the unit is due on stream in the first quarter of 2029. Management says the project will lift SOCAR’s total investment in Türkiye to USD 20 billion.
The Turkish version of the press release does not name the consortium members; the English version mentions KT Kinetics. Suppliers of pumps, valves and compressors for the unit have not been announced, so the sub-supply packages are still ahead.
Petkim: licences and FEED for new plants
On 28 September 2026 Petkim, under its master plan, began licensing and engineering work on new ethylene, polyethylene and polypropylene plants with Technip Energies (France), Univation Technologies and Lummus Novolen Technology. The FEED budget is USD 70 million and the work is due for completion by the end of 2027. Physical equipment orders will follow FEED, roughly from 2028. For suppliers this is an early signal: getting onto the vendor list is easier during FEED than after it.
Tüpraş: refinery energy and propylene
In its nine-month 2026 report Tüpraş reports signed agreements for turbine supply and infrastructure for a 12.6 MW wind farm in İzmir. This is refinery energy infrastructure, not process compressors. The same report mentions a propylene project worth about USD 270 million, but that investment decision dates from 2024, so it is not a new 2026 contract.
Which tenders did TPAO and BOTAŞ launch in 2026?
Short answer: tenders for pumps, pipe, LNG carriers and compressor station modifications ran throughout the year. Winners and values are mostly not public, so a tender should not be read as a signed contract.
| Bid deadline | Buyer, tender no. (İKN) | Subject |
|---|---|---|
| 30 Jan 2026 | TPAO Şırnak, 2026/83278 | Hire of 40 tractor-trailers with drivers for 12 months to move rig materials, casing and pumps at the Bestesor–Gabar fields |
| 16 Feb 2026 | TPAO, 2026/25982 | One-year directional drilling service with rotary steerable systems (RSS) |
| 28 Apr 2026 (prequalification) | BOTAŞ | Two newbuild LNG carriers of 174,000 m³ |
| 11 May 2026 | BOTAŞ, 2026/655010 | Repair of the seawater intake basin at an LNG terminal |
| 3 Jun 2026 | BOTAŞ, 2026/700330 | Steel pipe for the Çeşme natural gas pipeline |
| 23 Jun 2026 | TPAO, 2026/828443 | Centrifugal pumps: 13 line items (not necessarily 13 units) |
| 27 Aug 2026 | TPAO Şırnak, 2026/1393953 | HOT-TAP tools; domestic bidders only, 15% price advantage for domestic goods |
| 15 Oct 2026 | BOTAŞ, 2026/1879031 | 940-day (±60) charter of an LNG carrier, 173,600–175,000 m³, built 2015 or later; open to domestic and foreign bidders |
| 3 Nov 2026 | BOTAŞ, 2026/1905571 | Pipeline modification for bidirectional operation of the Çorum compressor station |
| 16 Nov 2026 | BOTAŞ, 2026/1883128 | Steel pipe for the Aliağa–Üçpınar gas pipeline (bids not yet opened) |
Note that the BOTAŞ Çorum tender concerns piping modifications, not the purchase of a new compressor, and that TPAO’s “13 items” of centrifugal pumps are 13 line items rather than necessarily 13 units. These details matter when sizing the market.
Which legacy projects still shape demand?
Short answer: some of the big 2026 headlines are the execution of 2024–2025 decisions. For suppliers they signal sub-supply and service opportunities rather than new tenders.
- Sakarya Phase 2. A Subsea7 variation order (USD 300–500 million) for FPU, riser, umbilical and mooring installation was signed on 10 May 2024. Earlier, Saipem received the offshore EPCI scope for eight rigid flowlines and a 24-inch gas export pipeline on the project.
- The Phase 3 floating production unit. It is being built by China’s Wison New Energies: topsides fabrication started in May 2026, and the keel was laid on 25 October 2026 in Nantong (announced on 2 November). Gas processing, compression and export capacity is 25 million standard cubic metres a day. The contract value and compressor OEM have not been disclosed.
- Drilling rigs at Gabar. The Ministry of Energy announced the “Seyit Onbaşı” and “Naim Süleymanoğlu” rigs, built with two Turkish companies and a university, on 27 August 2025. Company names and values were not disclosed.
- Black Sea drillship. The deployment of the Yıldırım drillship to the Black Sea was announced on 30 December 2025, so its 2026 operations are not a new purchase.
- LNG and FSRU. A plan dated 1 February 2026 provides for an additional 28 million m³ a day of regasification capacity at Dörtyol and a new facility between Gazipaşa and Anamur. Contractors, equipment OEMs and values have not been announced: this is a future market.
Sakarya’s scale explains why it drives demand: discovered in 2020, the field lies about 170 km offshore in 2,150 metres of water, holds 405 billion cubic metres of proven gas reserves and delivered first gas in April 2023.
How much does Türkiye import in pumps, compressors, valves and pipe?
Short answer: in January–September 2026 imports across five product groups that matter to oil and gas totalled USD 5.37 billion. These are imports for all industries, not for oil and gas alone.
| HS code (GTİP, 4-digit) | Product group | Imports Jan–Sep 2026, USD |
|---|---|---|
| 8413 | Pumps for liquids | 1,257,005,369 |
| 8414 | Air and vacuum pumps, gas compressors, fans | 1,351,376,688 |
| 8481 | Taps, cocks, valves and similar appliances | 1,848,822,408 |
| 7304 | Seamless iron and steel tubes and hollow profiles | 623,215,700 |
| 8430 | Boring, earth-moving and mining machinery | 291,976,540 |
| Total | Five groups | 5,372,396,705 |
Source: TÜİK foreign trade database (general trade system, imports, USD, query of 11 November 2026). The latest bulletin, released on 28 October, covers September; the next is due on 30 November 2026, so January–November figures are not yet available.
These figures should not be presented as the size of the oil and gas equipment market. HS 8414 includes household and industrial fans, 8481 includes plumbing valves, and 7304 covers only seamless pipe (large-diameter welded pipe used for gas lines is not included). Still, they are a useful guide: valves and compressor equipment are the largest import categories, and that is where foreign manufacturers have the best chances.
What local content rules apply to suppliers?
Short answer: since 1 January 2026 the domestic goods certificate (Yerli Malı Belgesi) is issued under new rules: at least 51% local contribution, registration in the industrial registry and manufacturing in Türkiye. Some tenders exclude foreign bidders, and domestic goods receive a price advantage.
What changed on 1 January 2026
Communiqué SGM-2024/10, published in the Official Gazette on 25 January 2025, took effect on 1 January 2026. For an industrial product to qualify as domestic it needs at least 51% local contribution, an industrial registry certificate (Sanayi Sicil Belgesi) and manufacturing or substantial processing in Türkiye. This is a rule for certifying products, not a requirement for 51% local content across every project.
How it works in tenders
A 2026 example is the TPAO Şırnak tender for HOT-TAP tools: only domestic bidders were admitted, and goods with a domestic certificate received a 15% price advantage. That condition belongs to this specific tender and cannot be assumed for all purchases. The BOTAŞ LNG carrier charter, by contrast, was open to foreign bidders.
TPAO localisation programmes
On 28 January 2026 TPAO launched a call for the domestic development of 9⅝-inch N80/N-80Q ERW casing to API 5CT/5B standards (deadline 13 March 2026). This is R&D and prototyping, not a serial purchase, but the direction is clear: TPAO is steadily replacing imported tubulars, rigs and tools with domestic products.
What does this mean for foreign equipment suppliers?
Short answer: demand exists and will grow through the end of the decade, but the winners are companies that enter through major contractors and build a local presence.
Where the real opportunities are
- Sub-supply to major contractors. Subsea7, Tenaris, Wison and the STAR consortium buy components, valves, pumps and instrumentation. Getting onto their vendor lists is often more realistic than winning a direct TPAO tender.
- Future projects at FEED stage. Petkim (ethylene, polyethylene, polypropylene), new FSRUs and underground gas storage expansion. Vendor lists take shape during FEED.
- Valves and compressor equipment. The largest import categories, with demand in oil and gas and adjacent industries.
- Service and spare parts. Once Sakarya’s facilities are on stream, a long maintenance cycle for subsea equipment and floating units begins.
Risks and constraints
- Price advantages and restrictions on foreign bidders in some state tenders.
- Most contract values are undisclosed, which makes the market hard to size from public data.
- Currency risk: some budgets are stated in lira (as with STAR), while equipment is paid for in dollars or euros.
- Long cycles: 18–24 months typically pass between FEED and equipment orders.
What companies should do
- Monitor notices in the Official Gazette (ilanlar section), on the BOTAŞ website and in EKAP; searching by tender number (İKN) helps.
- Approach the Turkish offices of international EPC contractors and complete their supplier qualification.
- Consider local assembly or a partnership with a Turkish manufacturer to qualify for the domestic goods certificate.
- Prepare API, ISO and TPAO documentation in advance: qualification takes months.
- Check Turkish partners through the Trade Registry Gazette (TTSG) and court databases.
Frequently asked questions
Can a foreign company bid in TPAO and BOTAŞ tenders?
Yes, many tenders are open to foreign bidders (for example, the BOTAŞ LNG carrier charter in October 2026). Some tenders, however, admit domestic companies only, and the notice says so.
Where are tender notices published?
In the notices section of the Official Gazette, on botas.gov.tr and tpao.gov.tr, and in the EKAP public procurement system (ekap.kik.gov.tr).
What is the price advantage for domestic goods?
When bids are evaluated, the price of goods holding a Yerli Malı Belgesi is notionally reduced (by 15% in the TPAO HOT-TAP tender), giving local manufacturers an edge over imports.
Which project creates the most equipment demand?
Phase 3 of the Sakarya gas field: pipe, subsea equipment, umbilicals, risers and a floating production unit with 25 million m³ a day of capacity.
How much are the Sakarya contracts worth?
Exact values are not disclosed. Subsea7 gives ranges: the main Phase 3 contract is USD 750 million to 1.25 billion (2025), and the 2026 variation orders are USD 300–500 million and USD 50–150 million.
Sources
- Tenaris, 28 Jan 2026; SteelOrbis, 29 Jan 2026
- Subsea7, 4 Mar 2026; Subsea7, 23 Sep 2026; Offshore Technology, 5 Mar 2026
- SOCAR Türkiye: STAR Refinery; SOCAR Türkiye: Petkim, 28 Sep 2026
- Tüpraş, 9M 2026 interim report
- Wison New Energies, 2 Nov 2026; OE Digital, 24 Sep 2026
- Official Gazette notices: 22 Jan 2026, 16 Jan 2026, 28 Jan 2026, 16 May 2026, 5 Aug 2026
- BOTAŞ: Çeşme, LNG terminal, LNG carrier charter, Çorum, Aliağa–Üçpınar; Anadolu Agency, 16 Apr 2026
- Türkiye’s Ministry of Energy: 27 Aug 2025, 30 Dec 2025, 1 Feb 2026
- TÜİK foreign trade database (query of 11 Nov 2026); TÜİK bulletin, 28 Oct 2026
- Official Gazette, 25 Jan 2025: Communiqué SGM-2024/10
Prepared from public sources as of 11 November 2026 for information purposes only. Contract values are given as disclosed by the companies (often as ranges); tender notices do not mean signed contracts. Editorial conclusions are kept separate from facts.